Singapore

Saturday, February 7, 2009





I will leave Malaysia this morning. For how long I’m still not sure yet. But the dry-docking will take approx. 1 month .Ya Allah tabahkan hati hambamu ini. Permudahkanlah segala urusan hidupku. Jauhi aku dari segala kemaksiatan. SesungguhNya engkau Tuhan sekalian alam.



Amin.

Subsea Engineering: Diving

Tuesday, February 3, 2009


Divided into :

i) Air Diving (1-50m)
ii) Saturation Diving (>50m)

Basic Air Spread :

i) Launch & Recovery System ( LARS )
ii) HP & LP Compressor ( for breathing )
iii) Air Basket/Cage & Clump Weight
iv) Air winch/tugger
v) Air Diving Contol Panel
vi) Diving Helmet/Mask
vii) Hydraulic Power Pack
viii) Umbilical
ix) Hyperbaric Rescue Chamber (HRC)/Decompression Deck Chamber ( DDC )

Basic Saturation Spread :

i) Launch & Recovery System ( LARS )
ii) Environmental Control Unit
iii) Diving Bell and Living Chamber ( for diver )
iv) Heliox Gas
v) Sat Diving Contol Panel
vi) Diving Helmet/Mask
vii) Hydraulic Power Pack
viii) Umbilical
ix) Self-Propelled Hyperbaric Lifeboat ( SPHL ) and davit

Just some information, based on what my manager told me roughly. I’m just a young engineer in this field.


This association provides some code and guidance that we need to follow. Actually all related jobs must follow this rules & guidance from IMCA. There are a few rules & guidance from international organizations related to this field : International Marine Organization (IMO), Association of Diving Contractor (AODC), Det Norsk Veritas (DNV). And the focus more to Air & Sat Spread and Diving Support Vessel (DSV).

Mostly in Petronas, Murphy, and others tender, they will put this IMCA requirement for all equipments and machineries for subsea construction.

Code that focusing on diving in IMCA are :

i) IMCA D014
(IMCA International Code of Practice for Offshore Diving)
ii) IMCA D018
(The Initial and Periodic Examination, Testing and Certification of Diving Plant and Equipment )
iii) IMCA D023
(DESIGN for Surface Oriented (Air) Diving Systems)
iv) IMCA D024
(DESIGN for Saturation (Bell) Diving Systems)

Dialog Group Berhad



Before CNY, I got a call from Dialog HR. She was calling me and asking me to come for job interview. Hmm, just like what my lecturer said, there are other offers when you have started your new job. So, I just told her that I will thinking about it later and give an answer after CNY.After making some research about this company; I found that the company is very stable one. Listed in main board of KLSE in trading&services division. Their main business is a service provider/specialist in oil&gas, petrochemical industry.

Here some info ;

After CNY, I have called back her and told that I need to go for dry-docking in Singapore at least 1 month. So, can they wait for 1 month? After she had some discussions about this problem with her manager, and she said that they will wait for me after the dry-docking.

Alhamdullilah, I was thinking that the company really needs me? Why?

The reasons are :

i ) I have applied the job application through their website about October 2008. They still kept my CV until today.
ii ) They can wait until I finished my job in Singapore just for an interview? Why not they just call for other candidates?

Just my 2 cents. Btw, I’m not confirmed yet that will get the offered job. Just feelin really excited right now. InsyaAllah dapatlah.

My Little Brother

Telinga kena kebal,

Hati kena kental,

Even kena sental.

Aku?

Aku takde hal,

Makian, cacian, tohmahan, soalan,jawaban

Aku immune itu semua.

Wahai keluargaku inilah kenyataan.

Asset Management (Technical)

I have been assigned directly under Asset Manager. So, probably after probation period my title is Asset/ Base Engineer. My job scope are :

i) Familiar with IMCA code IMCAD018, IMCAD023, IMCAD024, DNV-Offshore Service Specification-305 and DNV Offshore Standard-E402. All of the codes related to diving system (air & saturation diving) guides and regulations.
ii) To assist Asset Manager/Operation Team in order to maintain/service/supervise all company assets. Keep and manage all related documents about equipment/machineries maintenance. Must be updated once in 6,12,24,72 months depends on equipment/machineries conditions.
iii) Liaise with procurement department to purchase/repair/transfer machinery/equipment.
iv) Current project is dry-docking our DP DSV Offshore Stephaniturm at Jurong SML Shipyard Ltd, Singapore on February 2009.
v) Make sure all equipment/machineries are in safe and good condition during mob and de-mob on chartered vessel.


My new experiences since join this company were :

i) Just walked around DP DSV Offshore Stephaniturm when she arrived at KSB, Terengganu. I also looking for some certificates for wire rope ( air tugger, diving bell, air basket ) at Inspection Room.
ii) Communicate with vendor in order to arrange for repair broken equip/machineries
iii) Making some minor budgets, copying some related documents for dry-docking Offshore Stephaniturm this February.
iv) Went to Miri, Sarawak. Actually I want to monitor some fabrication works there for 2,3 days but due to thruster problem that affected the DP system of the vessel, I just taking back the things back to KL
v) Meeting with the big boss for dry-docking matters.
vi) Soon, I will monitoring/assisting my manager during dry-docking at Jurong SML Pte Ltd and Loyang Offshore Supply Base.